Thursday, March 3, 2016

Wheel Pants and Cowling work





Fitting the wheel fairings together and making initial cuts


 Leveling the aircraft for wheel fairing fitting


Fairings are fitted and ready for final drilling

Air inlet ramps are fitted to top cowling




Air inlet ramps are glued in place and edges are molded and feathered with epoxy micro mix


Oil door is fitted and installed

No comments:

Post a Comment