Saturday, May 9, 2015

Fuselage assembly and roll over bar


No update for a couple week so here is what has been happening with the project.  The fuselage kit is coming together, not a whole lot left on it... This update is a lot of work on the roll over bar assembly and installation..

 Forward Top Skin being fitted 


Installing Canopy Cradle Assembly

Canopy Release / Gas Springs and Canopy Cradle are installed 


Canopy Release / Gas Springs and Canopy Cradle are installed , the Top Skin is sealed and rived

Elevator Bellcrank is built and primed for installation

Control Sticks are assembled and ready for installation
Bellcrank ,Push Tubes and Control Sticks are installed



Bellcrank ,Push Tubes and Control Sticks are installed



Bellcrank ,Push Tubes and Control Sticks are installed



Bellcrank ,Push Tubes and Control Sticks are installed



Bellcrank ,Push Tubes and Control Sticks are installed

Assembly of Section 37 Roll Over Structure



Assembly of Section 37 Roll Over Structure


Assembly of Section 37 Roll Over Structure


Assembly of Section 37 Roll Over Structure


Assembly of Section 37 Roll Over Structure






Assembly of Section 37 Roll Over Structure


Final fitting of the Roll Over Structure

Final fitting of the Roll Over Structure

Final fitting of the Roll Over Structure


Roll Over Structure gets painted and installed


Roll Over Structure gets painted and installed


Roll Over Structure gets painted and installed


Roll Over Structure gets painted and installed


Roll Over Structure gets painted and installed


Roll Over Structure gets painted and installed


Roll Over Structure gets painted and installed



Work begins on assembly and fitting the Tail Group to the Fuselage  

Work begins on assembly and fitting the Tail Group to the Fuselage  

Work begins on assembly and fitting the Tail Group to the Fuselage  

























No comments:

Post a Comment