Another week in the books and more progress on the fuselage is made.
finished L&R step attach assembly's
the bottom skin is clecoed to the Baggage ribs and step attach assembly's for reveting
the finished mid fuse lower section
Start section 27 Firewall the finished L&R firewall angles
he L&R firewall sides are dimpled
the firewall sides are ready for assembly
the L&R sides are mated to the firewall top , fuel tank sealant is applied to the bottom aft side of the firewall top and the assembly is clecoed together with the L&R tunnel assemblies for riveting
the firewall assembly is riveted
The sections are positioned together "Makes me want to sit in it and make airplane sounds" says builder Allen.
"Section 27" of the fuselage is completed!