![]() |
| The Flaps and Ailerons are done! |
| Robs #1 girl Megan thinks cleco pliers are a weapon. |
![]() |
| Fabricating the Aileron pushrods. |
| Two flaps and an aileron....what to do? I know, another aileron! |
![]() |
| Ready to complete the left aileron. |
![]() |
| That piece of stainless steel pipe in the leading edge of the aileron is the counterbalance. |
![]() |
| Rob the riveter. |
| Taught my big brother, Clarke how to back rivet. (stiffeners to the aileron skins) |
| Rob and myself making aileron hinges. |
| Marking the aileron stiffeners before cutting. |
| Both flaps complete! |
| Prime time for aileron parts. |
![]() |
| Starting to look like a Flap! |
![]() |
| Match drilling the trailing edge. |
![]() |
| Match drilling the Left Flap nose ribs. |
| Clecoing the Flap trailing edge extrusion to the lower flap skin. |
| I don't know what the weather outside is doing, and I don't care! |
| Flap hinges and ribs get fitted. |
| Flap skeleton all clecoed up! |
![]() |
| Here the end rib is clecoed in and a flange adjusted to match the leading edge skin angle. |
![]() |
| Riveting the flap hinges together. My arm is tired! |
| Prime time! Hope everyone had a great Independence Day! |
![]() |
| It is very important to buff the radiuses of any nose ribs. Failure to do so will lead to a crease in the leading edge. |
![]() |
| Started working on the flaps. Here I cleco hinge parts together for match drilling. |
| Preparing to match drill a flap nose rib to a doubler. |
| Dynon heated Pitot and AOA probe all plumbed,wired and installed. |